Booth Avenue Drainage Improvements
Project Summary
Flood issues were occurring along Third Street due to storm water runoff from commercial and residential areas flowing down Booth Avenue. A storm sewer system consisting of 54 inch reinforced concrete pipe and curb inlets were constructed to prevent flooding along Third Street.
Services Provided:
Hydrologic and Hydraulic Analyses, Engineering Design, Bidding Services, Construction Administration, Survey, Inspection Services, Construction Staking