
This project involved the placement of approximately 1,825 linear feet of 30” diameter water main, 286 linear feet of 24” diameter water main, 113 linear feet of 30” diameter water main, and 28 linear feet of 12” diameter water main. The piping of the elevated water storage tank on Reno Avenue was also retrofitted.