Project Summary

Flood issues were occurring along Third Street due to storm water runoff from commercial and residential areas flowing down Booth Avenue.  A storm sewer system consisting of 54 inch reinforced concrete pipe and curb inlets were constructed to prevent flooding along Third Street.

Services Provided

Hydrologic and Hydraulic Analyses, Engineering Design, Bidding Services, Construction Administration, Survey, Inspection Services, Construction Staking