Project Summary

An extensive study of the City of Guthrie’s sewer system was conducted as part of this project.  The result of this project was the replacement of over 36,000 linear feet of sewer lines throughout the system and the construction of over 175 manholes, providing substantial improvements to the City’s wastewater collection system.