
This project consisted of the engineering design and construction of a new 14 MGD Water Booster and Treatment Facility to serve the City of Elk City. This involved the construction of a new plant building, pumping system, electrical system, chemical feed system, process piping, yard piping, above ground water storage tank, SCADA system, and site work for the proposed facility.