Sulphur Wastewater Treatment Plant

Project Summary

This project involved the expansion of the existing SBR system to a 3-cell system with digesters, sludge handling, and FEB design.  The Wastewater Treatment Plant Capacity is 1.5 MGD average and 4.5 MGD at peak flow.

View More Projects

New Runway Construction and Extension of the Parallel Taxiway with Construction of Connecting Taxiways

New Runway Construction and Extension of the Parallel Taxiway with Construction of Connecting Taxiways

  • Airport
PC-0273 – Paving and Drainage Improvements NW 150th Street from Western Ave to Santa Fe Ave

PC-0273 – Paving and Drainage Improvements NW 150th Street from Western Ave to Santa Fe Ave

  • City Streets
250,000 Gallon Elevated Water Storage Tank

250,000 Gallon Elevated Water Storage Tank

  • Water Distribution